Work Completed Last Week:
·
Continued with water service replacements along
Heatherfield Lane.
Work Anticipated This Week:
·
Complete water service replacements along
Heatherfield Lane.
·
Make connections between existing water main and
newly installed water main at:
o Heatherfield
Lane and Sherwood Road
o Heatherfield
Lane and Beech Drive
o Heatherfield
Lane and Ferndale Road
·
Continue with storm sewer installation along
Heatherfield Lane.
New water services are being installed from the new water
main to the existing b-box within the Village right-of-way. New services will not
be installed all the way to your home. During water service installation, water
to individual homes will be turned off while the transition is made. Typically
the water is turned off for 1-hour. The contractor will knock on the door of
each home prior to turning off the water. It is difficult to determine the
exact timing of the water shut-off; therefore, 24-hour notice is not given. The
contractor will work with you to determine the best time to shut-off the water
to the greatest extent possible.
Due to the condition of the existing water main, there have
been several water main breaks during the water service replacements. Most of
these repairs are being made without needing to turn off the water main;
however, in several instances the water main has been required to be turn off
to make the needed repairs. We apologize for these inconveniences. We are
committed to letting all affected residents know about the emergency shut-downs
as quickly as possible and to reduce the amount of time the water main is
turned off to the greatest extent possible. We thank you for your
understanding.
This week, there will be several scheduled water main shut
downs to make the connections between the existing water main and newly
installed water main. For this work, residents will be notified 24-hours
prior to the water main being turned off.